Hydraulic schemes

Search by filters

Scheme: 423h
WXE 423h
Products: WXE20
Use: Extension scheme, combined boiler (solid fuel/oil), domestic hot water storage tank, 2 mixing circuits.
Scheme: 423g
WXE 423g
Products: WXE20
Use: Combined boiler (solid fuel/oil), 2 mixing circuits, domestic hot water storage tank.
Scheme: 423f
WXE 423f
Products: WXE20
Use: Solid fuel boiler, 2 mixing circuits, domestic hot water storage tank.
Scheme: 423e
WXE 423e
Products: WXE20
Use: Heat pump, storage tank, 2 mixing circuits, domestic hot water storage tank.
Scheme: 423d
WXE 423d
Products: WXE20
Use: Heat pump, storage tank with integrated domestic hot water storage tank, heating with electricity, 2 mixing circuits.
Scheme: 423c
WXE 423c
Products: WXE20
Use: Heat pump, gas boiler, storage tank with integrated domestic hot water storage tank, 2 mixing circuits.
Scheme: 423b
WXE 423b
Products: WXE20
Use: Heat pump, storage tank with integrated domestic hot water storage tank, oil boiler, 2 mixing circuits.
Scheme: 423
WXE 423
Products: WXE20
Use: Oil boiler, 2 mixing circuits, domestic hot water storage tank.
Scheme: 422d
WXE 422d
Products: WXE20
Use: Heat pump, oil boiler, storage tank with integrated domestic hot water storage tank, mixing circuit.
Scheme: 422c
WXE 422c
Products: WXE20
Use: Heat pump, oil boiler, storage tank, mixing circuit, domestic hot water storage tank.
Scheme: 422b
WXE 422b
Products: WXE20
Use: Heat pump, oil boiler, storage tank with integrated domestic hot water storage tank, mixing circuit.
Scheme: 422
WXE 422
Products: WXE20
Use: Heat pump, storage tank with integrated domestic hot water storage tank, auxiliary heating with electricity, mixing circuit.
Loading

NOTICE

Dear customers!

Please be informed that our store Seltron d.o.o. will be closed on the following days 12-13 January 2024 for annual inventory purposes.

Thank you for your understanding.

NOTICE

The Seltron service will be closed from 27 December to 29 December 2023.

Any emergencies or issues that arise during our absence will be dealt with as soon as the service reopens on 3 January 2024.

Thank you for your understanding.